Now Reading
Skyway Stage 3 is now fully operational and toll-free until Feb. 1

Skyway Stage 3 is now fully operational and toll-free until Feb. 1

  • All access points and seven lanes of the expressway officially opened to the public on Jan. 15

If you’re a motorist looking to avoid traffic by passing through Skyway Stage 3, you need not worry about toll fees just yet. San Miguel Corporation president Ramon Ang recently announced that the expressway will not be charging toll fees until Feb. 1.

https://www.facebook.com/smcramonang/posts/214567046965007

Skyway Stage 3 officially began operations on Jan. 15, opening all seven lanes and access points to all motorists. The project goes from the South Luzon Expressway in Alabang up to the North Luzon Expressway in Balintawak, and is expected to cut short to 30 minutes the travel time from SLEX to NLEX, and vice versa.

Ang announced that the toll-free period was extended from Jan. 29 so that “motorists can experience and enjoy seamless driving along this engineering marvel over Metro Manila’s congested streets.”

The expressway is expected to decongest and improve traffic flow in thoroughfares such as EDSA and C5. Skyway Stage 3 partially opened on Dec. 29, with motorists reporting improved traffic flow during its initial operations.

situs judi online terpercaya slot online tergacor situs slot gacor catur777 slot online idn poker judi bola sbobet slotgacormaxwin wwwl24.mitsubishielectric.co.jp game slot online QQLINE88 3mbola catur777 slot gacor 2024 slot gacor maxwin resmi
Agen Situs Pkv Games Terpercaya slot online
Situs Judi Bola Online situs idn poker idn poker
daftar gambar togel
PROBOLA agen daftar situs judi slot online terpercaya dengan games pragmatic play yang sangat populer
situs slot pulsa